Office Inventory List for Shifting
Add how many of each item your office has. Download the list in Excel, print it, or send it to us for a quotation. Your list stays on this device until you send it.
Workstations and seating
Storage and files
Meeting rooms
IT and electronics
Pantry and utilities
Anything else
Send this list for a free quotation
We call you to fix a site survey and send a written, itemised quotation.
Office Relocation Checklist
30 tasks in six stages, from the first planning meeting to the first day at the new office. Tick them as you go; your ticks are saved on this device.
8 to 12 weeks before Plan and budget.
6 weeks before Buildings, IT and interiors.
4 weeks before Inventory and people.
2 weeks before Address and paperwork.
Move week Pack, move, check.
After the move Settle in.
How to Use the Office Relocation Checklist and Inventory
- Count group by group. The planner lists 34 common office items in five groups; pick a group from the strip of icons. Add a quantity with the + button or type it in, and add anything that is not listed.
- Download it in Excel. The file has your move details and a notes column for fragile items, dismantling and new desk numbers. Prefer to fill it in by hand? Download the blank template instead.
- Print or save as PDF. The printout carries the inventory and the week-by-week checklist on separate pages, ready to hand to the facilities team.
- Send it for a quotation. The list reaches our office team with your move details, so the survey starts from what you already counted.
Office Move Checklist Template in Excel, PDF and Google Sheets
Whether you call it an office relocation checklist, an office shifting checklist or an office moving checklist, the downloads on this page cover it:
- Excel template, free download. The Template button gives you an Excel file with a blank office inventory list template and the 30-task office move checklist on a second sheet, with a Done column. Upload it to Google Drive to use it as a Google Sheets template.
- Your own list in Excel. The Excel button downloads the items and quantities you entered, ready to share with your facilities team or your mover.
- PDF. Print / PDF saves the inventory and the checklist as a PDF.
- An office relocation plan. The six stages work as a simple office relocation project plan: each stage has an owner-sized set of tasks and a time frame counted back from your move date.
Not sure what to count? The planner already lists 34 common office items, from workstations and chairs to servers and pantry appliances, so it doubles as a list of office furniture and equipment to check off.
What Office Shifting Costs and What Changes It
Our published starting range for an office of up to 15 desks is ₹18,000–₹35,000. The figure moves with:
- Desks and storage. The inventory above is most of the volume.
- IT equipment. Servers, racks and copiers need extra packing and care.
- Floors and building rules. Service lift access, restricted hours and long carries add labour time.
- Timing. Night and weekend moves are planned around the building's rules.
The final charge is confirmed in a written quotation after a survey, and may vary with the volume of goods, building access, distance, moving date and prevailing fuel and toll costs. See office shifting services for how a move is run, or the 2026 rate card.
